Kurgankhimmash ships heat-exchange apparatus to Uzbekistan
02/09/2015 14:11
Kurgankhimmash ships heat-exchange apparatus to Uzbekistan
02/09/2015 14:11
Tashkent, Uzbekistan (UzDaily.com) -- Kurgankhimmash successfully executed an order of LUKOIL Uzbekistan Operating company for production of Gas-Gas heat-exchange apparatus for construction object on heating dried gas at Jarquduq complex gas preparation facility at main facilities of Shurtanneftegaz.
The Russian company said that the equipment is designed for heating dried gas.
The diameter of each heat exchanger is 1,200 mm, estimated pressure - 9.0 MPa, the weight assembly - 36 tonnes, and wall thickness - 48 mm.
High-tech equipments, produced at Kurgankhimmash, are demand in the oil and gas market of Uzbekistan.
The plant has a rich experience of cooperation with Uzbek partners for the supply of various products, including capacitive, separation equipment, reinforcing blocks, and more.
Soon, the heat-exchange apparatus will arrive in Uzbekistan with railway transport.
Subscribe to our Telegram channel!
25/04/2024Read more
$ 1 | 12667.00 | +0.022% |
1 | 13481.49 | -2.022% |
₽ 1 | 135.77 | -0.506% |